(313) 887-1297
Shop
Data Drops for Install
Configure and Install Networking Hardware
Configure Phone System
Deployment and Implementation
AVG Installation
Box Implementation and Training
Google Apps Implementation and Training
RingCentral Implementation and Training
Cloud Server with Peachtree Installation
Firewall Configuration
Access Point Installation
Install Four Data Drops
Vertical Chase Installation
Install Wall Mount Bracket, Patch Panel and Switch
Mount Zoom Room Hardware
Labor
Configure and Deploy Ring Central
Hard drive recovery
Setup and Configure Networking Hardware
Setup and Configure Computing Devices
Setup and Configure Box and Google Apps
Training for New Services
Setup and Configure RingCentral
Data drops for install
Installation and Configuration of Main Floor Model
Mount, Setup, and Configure Camera System
Install cabinet, rack, patch panel, shelf
Cabling runs/Hardware install for Access Control
Configure Access Control
Labor for Install and Configuration
Cabling and Install
Setup/Configure Networking Switch and NVR
Setup and Configure Box
Box Training
Move and Provision 1 Phone
Configure RingCentral Phone System
Training for RingCentral Phone System
Terminate and Tag 12 Data Drops
NVR Configuration
220v Electrical Service for Server Rack AC Unit
Coax Replace or Repair at the Following Locations
Repair Phone Lines to Multiple Rooms
Cabling Repair/Install April 2013
Video Security Project Change Order
DATA COMMUNICATIONS RACK
DATA INSIDE WIRING
NETWORK EQUIPMENT SETUP
VOICE INSIDE WIRING
Balance for Labor
Implememtation and testing
Extra Camera Installation
Data Line
Install CPU Cooler
Installation and Configuration-4 Hours per Firewal