1 tech 2 days extra for the month of October
Project Management for Summer Project for the mont
Last Mile Configuration / Data Migration for Admin
Cable survey and Design
Parts Material
Camera Installation, Aiming, and Testing priced pe
EMS PD November 14th Google Training
Middle School PD November 14th Google Training
High School PD November 14th google training
Install (1) CAT6 data cable from 1st Floor MDF loc
Material BOM
Adobe Acrobat Pro DC DC 2017 MLP
10GBASESR SFP MODULE
Misc, cables, clips, screws, velcro,labels etc
1 Meter Multimode Fiber Jumper, ST-LC Connectors
PM, Project Creation, Pre-Engineering Switch Progr
FAN FOR 25 OR 30"D WALL CABINET
Labor, Install vent fans in cabinet, test
EMS PD Dec 12th Google Training
Middle School PD December 12th Google Training
High School PD December 12th training
Adobe Creative Cloud CC MLP
15 % Basic Maintenance of Internal Connections for
15 % Managed Internal Broadband Services
Manufacturer Unknown - HARDWARE MOUNTING KIT
Parts to hook up cabling and Projector
Preplanning/Meeting 7/9/2018